Eight studies, eight experiments. Change a rule and explore a possibility. These are teaching models, not predictions.

Experiment 06

Bring the decision into daily life.

Connect an approved repair to resources, work and verification.

Read the matching study

Trace an approved repair into an outcome.

The vote has passed. The repair costs 100 units: 40 to mobilise work and 60 on completion. Try changing what stands between approval and payment.

Available repair budget100 units
Implementation responsibility
Reported and physical state
Completion check
Resident challenge route

From authorisation to delivery

  1. ✓
    Decision

    The repair is approved.

  2. ✓
    Funding

    The 100-unit cost can be funded.

  3. ✓
    Responsibility

    An operator is named.

  4. ✓
    Service

    The selected scenario restores the pump.

  5. ✓
    Verification

    Independent completion is recorded.

100paid from the budget
0held for completion

0 units remain uncommitted.

The decision reaches a verified working service.

Funding, responsibility and a check of the result turn an abstract vote into something residents can use. This is a practical chain a community can inspect and improve.

Inspect the assumptions and arithmetic

Budget and a named operator must both be available before 100 units are committed and the 40-unit advance paid. The remaining 60 is held until the completion rule is satisfied. Under report-only checking, either closed-ticket scenario qualifies. An independent check qualifies only when the selected scenario says the pump is repaired.

When the pump remains broken and the challenge route exists, assume residents report the fault in time; final payment is paused. This simplified model assumes accurate independent checks and timely reviews, and does not recover advances automatically. Real procurement needs verification costs, incentives, liability and a remedy after payment. Choosing “repaired” describes a scenario; it does not cause work to occur without funding and an operator.

Take this arrangement further.

Carry your settings into a private proposal. Add who can challenge the rule and what would justify changing it.

Return to the connected study

Preparing an amendment replaces your existing private draft.